Fullerton Property Maintenance
Project · Oxford Street, London

Commercial Bar Sink Plumbing in Oxford Street

Water and waste plumbing for a commercial bar sink, with the waste connected into the existing system in very limited space.

Location
Oxford Street, London
Services
Plumbing
Client
Commercial client

Project overview

Fullerton Property Maintenance carried out plumbing for a bar sink for a commercial client on Oxford Street, London: the water supply to the sink, the sink's waste, and the connection of that waste into the existing waste system.

The scope was clear: water in, waste out. What made it a demanding job was the space, with very little room to work.

Commercial plumbing work

A bar sink needs a water supply and a waste connection. The job was to plumb the water pipe for the sink, connect the sink waste, and connect the waste pipe into the existing waste system.

The challenge

Connecting the waste pipe to the existing waste pipe was the difficult part. There was very limited space, and very little allowance for positioning the pipe.

Working in a restricted space

The photo was taken during the work, in the restricted space beneath the bar. It shows the white waste and water pipework and the sink bowl, with a cordless drill alongside, and gives a sense of the access the plumbing had to be done in.

Waste and water pipework and a sink bowl in the restricted space beneath a bar, with a cordless drill alongside, during plumbing work
Working within the restricted space beneath the bar.

Water and waste connections

  • Plumbed the water pipe for the bar sink
  • Connected the bar sink waste
  • Connected the waste pipe into the existing waste system

Completed work

The plumbing work was successfully completed: the sink's water supply and waste connected, including the waste connection into the existing waste pipe.

Commercial property maintenance

We look after commercial properties as well as homes. If you manage commercial or rental premises, our property professionals page explains how we work with landlords, agents and managers.

Watch the work

A 24-second clip from the job, showing the pipework and the space the plumbing was done in.

Working within the restricted space beneath the bar. The clip has no sound.

Location

This project was in Oxford Street, London. We focus on Central and West London and on Croydon and the surrounding areas, and also work elsewhere within our published service area. The client's name and exact address aren't published.

Not sure we cover your property? See the areas we cover.

More Recent Projects

Completed timber summer house with grey-green double doors and windows, standing on a paved base

Uxbridge · Carpentry & Joinery · Electrical Services

Summer House Build in Uxbridge

A Dunelm summer house built from the base up, including carpentry and basic electrical work, with warped timber and a rain delay worked around.

Read about the Uxbridge summer house build
Assembled black gloss chest of drawers with eight drawers, standing in place

Morden · Furniture Assembly

8-Drawer Chest of Drawers Assembly in Morden

A black gloss 8-drawer chest of drawers assembled from its boxes — a straightforward furniture assembly job.

Read about the Morden chest of drawers assembly

Need something similar done?

Send us the details and any photos, and we'll come back to you with next steps.

CallWhatsAppQuote